Wei | DS230 E – DRILLING RIG 230 MTON
Hydraulic Drilling-Workover Rig, for geothermal, Oil and Gas-wells till over than 6.000 mt.
Skid mounted, Sliding mast, Rig completed by Top Drive, Hydraulic Power Tong, Rotary Table with Automatic Power Slips, Rotating Jib Crane, Hydraulic Elevators.
Separate Automatic Pipe handler and pipe rack.
Mast lattice type inspired by WEI experience in the Oil and Gas Sector.
ESP Column installed.
940 kW Electric Power Unit.
Custom made as all WEI Rigs.
DRILLING RIG 230 MTON Technical Data
Capacity |
DP Size | Depth |
5 ″ | 3.700 m - 12.140 ft | |
4 1/2″ | 4.600 m - 15.100 ft | |
3 1/2″ | 6.300 m - 20.700 ft | |
Mast |
Top Drive max stroke | Capacity |
17 m - 55.7 ft | 230.000 daN - 517.000 lbs | |
Max pull up | 230.000 daN - 517.000 lbs | |
Max pull down | 25.000 daN - 56.200 lbs | |
Power swiwel | Max Torque 2.600 daNm - 19.170 ftlb, 0 - 180 RPM | |
Hyd.Power Tong |
Max Break Out Torque 8.000 daNm - 59.000 ftlbs | |
from 2 7/8" to 13 3/8" | ||
Max stroke 1.000 mm - 40" | ||
ESP Column |
Capacity 16.000 daN - 35.280 lbs | |
Height 10 m from drill floor - 32.8 ft | ||
Jib crane | 5.000 daN - 11.240 lbs | |
Rig power unit | Electric 940 kW (2x470 kW) |