Wei | DS250 LT – DRILLING RIG 250 MTON
Hydraulic Drilling Rig for Oil and Gas-wells till 6.800 mt.
Working Temperature from -40°C to +40°C.
Semi-trailer mounted, Sliding mast, Rig completed by Top Drive, Hydraulic Power Tong, Rotary Table with Automatic Power Slips, Rotating Jib Crane, Hydraulic Elevators.
Separate Automatic Pipe handler and pipe rack.
Mast lattice type inspired by WEI experience in the Oil and Gas Sector.
Innovative Automatic Driller installed on the Rig.
Installed on Skidding System.
Custom made as all WEI Rigs.
DRILLING RIG 250 MTON Technical Data
Capacity |
DP Size | Depth |
5 ″ | 3.600 m - 11.810 ft | |
4 1/2″ | 4.450 m - 14.600 ft | |
3 1/2″ | 6.100 m - 20.000 ft | |
Mast |
Top Drive max stroke | Capacity |
22 m - 72.2 ft | 205.000 daN - 460.860 lbs | |
Max pull up | 205.000 daN - 460.860 lbs | |
Max pull down | 25.000 daN - 56.200 lbs | |
Power swiwel | Max Torque 3.900 daNm - 28.760 ftlb, 0 - 180 RPM | |
Torque wrench | from 3 1/2" to 13 3/8" | |
Make Up Torque 4.000 daNm - 29.500 ftlbs | ||
Break Out Torque 6.000 daNm - 44.250 ftlbs | ||
Hyd.Power Tong |
Max Break Out Torque 16.000 daNm - 118.010 ftlb | |
from 2 7/8" to 13 3/8" | ||
Max stroke 700 mm - 2.3 ft | ||
Jib crane | 5.000 daN - 11.240 lbs | |
Pipe Handler | for R2-R3 or double R2 | |
Rig power unit | Diesel 1.280 HP ( 2 x 640 hp) |